Project Start Date: October 2017
House Build Date: 1903
This pour home had sat empty for over two years. Left completely trashed on the inside, the foundation and front part of the house was in pretty good shape, so we decided to completely renovate it! After assessing the damage on the back of the house, the only solution was to completely rebuild the structure. Going from a small 2 bedroom 1 bath 1200 square foot home to a nice size 2000 square foot 3 bedroom 2 bath (complete with a master suite in the new upstairs), this home was quite the transformation. It sold in a few short days and the new owners were extremely pleased with their “new” old home!
Back of house Before
Back of house Demo2
Barth Ave (17)
Barth Ave (20)
Barth Ave (21)
Barth Ave (24)
1st Floor - 1
1st Floor - 2
1st Floor - 3
2nd Floor - 1
2nd Floor - 2
2017-09-19 11.00.29
2017-09-19 11.13.15
2017-09-29 11.51.48 HDR
2017-10-03 16.46.01
2017-10-13 11.18.51
Back of house Frame
Back of house Frame 5
Back of house Frame2
Photo Apr 11, 12 41 11 PM
Photo May 15, 9 20 27 AM
Barth Ave (1)
Barth Ave (2)
Barth Ave (2)
Barth Ave (3)
Barth Ave (4)
Barth Ave (5)
Barth Ave (6)
Barth Ave (7)
Barth Ave (9)
Barth Ave (10)
Barth Ave (11)
Barth Ave (12)
Barth Ave (14)
Barth Ave (13)
Barth Ave (8)
Barth Ave (3)